Go Solar with the best solar company in Maharashtra
-Bigwit Energy
Bigwit Energy a leading solar company in Maharashtra - We will take care of all the processes and the official work required to install rooftop Solar Plant in Maharashtra.
5 steps of going solar in maharashtra
Step 1: Finding the perfect size for you
Our Solar Expert will take your time and visit your residence, examine the roof and recommend the perfect system size taking in consideration upon your average power consumption pattern.
You would be able to choose the make of the components used in your solar plant along with the plant placement so that the plant is installed as per your will.
Step 2: Taking appropriate government approvals
Once you confirm, we will start the required paper work on your behalf which is needed to replace your existing energy meter with a net meter. This will allow the electric company to deduct the energy generated by the sun. In the backend, we will start procuring the material for your solar plant.
Step 3: Installation
When we get the required approvals and after your consent we would deliver the material at your residence and start the installation work. This takes about 4-5 days top.
Step 4: Replacement of your meter
After your solar plant is installed, we inform the concerned authorities in PSPCL who then perform a site survey. Then your existing electric meter is replaced by the net meter and we turn ON your plant! Exiting day for all!
Step 5: Final Handover
At this stage we would handover all the warranty documents for the components used on your rooftop solar power plant. Also we would give you a username and password for the app which will let you monitor the generation of your solar plant from anywhere on Earth !
*Service provided in selected areas in the state through our Dealer Network
Solar Plants we install are amongst the highest possible power generating systems in Maharashtra.
But don’t take our word for it, see what our customers say...
Mr Singh (5kW)
I have done a lot of survey before choosing BigWit Energy and I am delighted to say that my decision was 100% correct
Mr. Mahajan (10kW)
Recommended. I opted for the non-subsidy plant as the components were of better quality and it really din’t disappoint me. Thanks Bigwit team !
Mrs. Grewal (3kW)
“I am happy I choose Bigwit as my solar installer. As a old person living alone in a bungalow they also helped me going out of their scope of work”
Need more reasons to install rooftop solar, think of our mother Earth
Solar Power plants do not release any harmful global warming gasses while they generate electricity like all the conventional methods do.
We save about 1 tonne of carbon release in atmosphere per kW of solar plant installed!
Pictures of Some BigWit Energy Solar installations